EV CHARGING STATION OVERVIEW

CSA’s Mission is to provide Electric Vehicle Charging Systems to businesses/property owners to aid in the creation of a nationwide infrastructure that will support zero emissions and each state’s initiative to achieve their climate targets.

No Cost Placement for Retailer/Property Owner

1. No Cost Installation & Set up.
2. Ongoing Repair & Maintenance Program
3. Lucrative Revenue Share (10%)

LEVEL 3 CHARGING

  • Level 3 DC charging connects directly to the battery of the electric vehicle.
  • It takes 20 minutes for an 80% battery charge or between 240-320 miles, depending on the battery size in your vehicle. 
  • 120 kW of power–A DC Fast Charger delivers a powerful DC current directly to the EV battery. The current, typically up to 120 kW, bypasses the onboard AC to DC power converter. 
  • Level 3 charging is so fast it is a perfect match for consumers who have electric vehicles and need a quick turnaround time.
  • At the moment, most Level 3 charging stations can only be found in taxi and bus depots, airports and similar places. 
  • If Level 3 charging has a downside it’s that currently not every electric vehicle is able to accept the 120 kW the DCFC delivers. But this is quickly changing. All EVs that are being produced now can accept DC Level 3 charging.

Level 3 DC Fast Charging is becoming the industry standard.

EZ 60

1. Some Facts About the Future of EV State and Federal mandates will determine the future production of gasoline dependent automobiles vs. EV autos. Six states (NY, CA, MA, OR, WA, VA) have already passed legislation limiting the sale of internal combustion powered engine
vehicles by 2035. Industry experts expect that EV market will grow at 20% each year through 2030.
Copyright © 2025Grid-Distribution. All rights reserved.